Live weather

Showing posts with label Sewrage system in Berhampur city. Show all posts
Showing posts with label Sewrage system in Berhampur city. Show all posts

Wednesday, May 30, 2012

Work begins on Khallikote College foot over-bridge

Construction work on a foot overbridge to connect two sections of Khallikote Autonomous College in the city has started. It was a long-standing demand of students of the institution and citizens of the city. This more than a century-old heritage educational institution is located in the heart of Berhampur by the side of the stretch of NH-59 that passes through the city. Its main block is on one side of the highway. Its large stadium, indoor sports complex, and building of the Junior College is on the other side of the road. Students and teachers face problem throughout the day to cross the highway to travel from one section of the college to the other as the traffic on this stretch of highway is quite high. During peak hours it also causes traffic jam. In the past, there were accidents in front of the institution in which students were injured by speeding vehicles while crossing the road. The foot overbridge is being built at a cost of around Rs. 110 lakh and a major chunk of investment is being provided by the State government.
Source: The Hindu

Modern sewerage system for Berhampur on the anvil


Plans are on to have a modern sewerage system for Berhampur, an old traditional city of Odisha. Project report for such a sewerage system is being prepared. Recently the consultancy agency that is preparing the project report for the project had a meeting with the corporators of Berhampur Municipal Corporation (BMC) to sensitize them about the project. This meeting was also attended by city mayor Siba Shankar Dash, Berhampur MLA RCC Patnaik, and Gopalpur MLA Pradeep Panigrahy. As per the consultancy agency this project would be worth around Rs 600 crore. It will involve establishment of two sewerage treatment plants. These sewerage treatment plants would be attached to the two major water carrying channels of the city, Bahana Nala and Sapua Nala. Survey to prepare the project report is not complete. It is expected that detailed project report for this sewerage project would be ready by end of this year. Satellite data and ground level data would be used to prepare the project report. As per the project the open rains in the city would only carry rain water. Every household and building in the city would be connected to the underground sewerage system. Executives of the consultancy agency elaborated how each and every household has to be included in the project for it success otherwise it would be a failure. It may be noted that the old sewerage system of the city is in dilapidated state. At many places spaces for drains have been encroached. Due to it during rains flood like situations are occurring in several areas of the city.
Source: The Hindu
Source: The Sambad